Precinct Plan 052 - Town Centre Frame 'R' Precinct
Planning intent
The Planning Intent of the Town Centre Frame is set out in Section 5.2 of the DCP. This Precinct is intended to provide medium and high density residential and/or mixed use development to compliment the Town Centre Core. The Precinct is intended to provide support facilities and services to the Town Centre Core and accommodate a wide range of activities including administrative and commercial activities, facilities, and areas of medium and high density residential development. The overall community infrastructure and services, recreation and leisure facilities, public transport emphasis in development is to be upon flexibility, accessibility and integration of activity. In broad terms development along the major roads will be more intense, diverse and urbanised that in other parts such as transitional areas and in proximity the open space system. A gradual transition will be apparent.
Land uses are to generally complement the uses within the Town Centre Core and elsewhere within the frame, and should be integrated in functional and urban design terms with adjacent Precincts. The full range of Town Centre Frame land uses may be considered if such land uses are compatible with the emerging built form.
Residential development in the Town Centre Frame is intended to broaden the diversity of housing in the DCP area. When developed on its own higher density residential development typically will address the street with only minimal setback so as to extend the urban character and formality of the streetscape. The transition areas will reflect a less intense form of development surrounded by areas of landscaped private open space and will draw landscaped open space into the town centre through interconnected formal and informal public spaces. The preferred location for medium density residential development is in close proximity to public open space.
Land uses will be receptive to the establishment of transit related infrastructure. The establishment of the Public Transport Interchange (PTI) will serve as a means to influence the nature of surrounding development and harmonise with the development established in the Precinct in keeping with the market. The PTI will also act as a means to promote The Corso as a valuable pedestrian link between Lake Eden and the Town Centre Core.
Precinct plan
Precinct Plan 052(PDF, 323KB)
Sector Plans
Sector Plan 052-1000(PDF, 7MB)
Figures |
Drawing number |
Dated |
1 - Planning Context(PDF, 383KB) |
TCFRSectorFig1 |
June 2014 |
2 - Cadastral Boundaries(PDF, 280KB) |
TCFRSectorFig2 |
June 2014 |
3 - Precinct Plan Map(PDF, 283KB) |
TCFRSectorFig3 |
June 2014 |
4a - Sector Plan Map(PDF, 274KB) |
TCFRSectorFig4 |
September 2014 |
4b - Sector Plan Map(PDF, 314KB) |
TCFRSectorFig4 |
September 2014 |
4c - Sector Plan Map(PDF, 271KB) |
TCFRSectorFig4 |
September 2014 |
4d - Sector Plan Map(PDF, 285KB) |
TCFRSectorFig4 |
September 2014 |
4e - Sector Plan Map(PDF, 320KB) |
TCFRSectorFig4 |
September 2014 |
4f - Sector Plan Map(PDF, 278KB) |
TCFRSectorFig4 |
September 2014 |
5 - Sector Landscape Plan(PDF, 318KB) |
TCFRSectorFig5 |
September 2014 |
6 - Indicative Plan of Subdivision(PDF, 248KB) |
TCFRSectorFig6 |
June 2014 |
7 - Road Layout(PDF, 218KB) |
TCFRSectorFig7 |
June 2014 |
8 - Water Supply Headworks(PDF, 340KB) |
TCFRSectorFig8 |
June 2014 |
9 - Sewerage Headworks(PDF, 296KB) |
TCFRSectorFig9 |
June 2014 |
Metes and Bounds(PDF, 22KB) |
|
June 2014 |