Be advised that due to the installation of the handrail system around the lock compound and weir, the lock will be temporarily out of order on Monday January 20 between approximately 7:00 AM and 12:00 PM, and Tuesday January 21 between approximately 7:00 AM and 4:00 PM. Works on site are ongoing and are due to be completed January 2025. Council appreciates your patience to undertake these works safely.
Council will carry out scheduled maintenance works to the Bribie Gardens lock and weir from July 2024. The lock gates will close for approximately 7 weeks while Council drains the lock bay.
The works align with the canal's long-term maintenance plan.
Schedule of works
Works to the weir structure are ongoing. They are expected to be completed in late January 2025.
About the works
The required maintenance is to ensure continued serviceability and allow safe recreational boating. The scope of work also includes the installation of a cathodic protection system. This system aims to prolong the life of the lock and weir.
The planned scope of works includes:
- draining the lock bay, and general washing-down and clean-up
- concrete repairs and installation of cathodic protection system
- replacement of gate seals and repairs to gate steelwork
- repair and replacement of fenders
- replacement of safety handrails and fencing
- overhaul and general servicing of gearboxes and actuators
- replacement of lock compound concrete capping slabs
- maintenance of lock bay shutters.
Alternative boating arrangements
Residents will need to make alternative arrangements if they want to use their boat during this time.
Options include moving boats to another location or using the boat ramp located at the corner of Phoenix Avenue and Allamanda Drive.