Newport Waterways - maintenance dredging

We are undertaking scheduled maintenance dredging works within the Newport Waterways canal estate.

The project works include maintenance dredging in the following locations:

  • Kingfisher Canal
  • Northern Marina Basin
  • Skua Canal
  • Curlew Canal
  • The intersection between Kestrel Canal and Albatross Canal
  • Walkers Creek Canal.

Scope of works

The scope of the maintenance dredging works will encompass:

  • preparatory works at the Griffith Road Dredged Material Management Facility
  • pre-work hydrographic survey of the dredging areas before the commencement of dredging works
  • removal of dredged material by cutter-suction dredge. This includes movement of dredged material to the Dredged Material Management Facility
  • post-work hydrographic survey of the entire Newport Canal system after dredging works.

Dredging timeline

  • Start Date: early 2025
  • Duration: approximately five months, subject to weather conditions.
  • Working hours: Monday to Saturday, 7:00 AM to 6:00 PM, excluding public holidays.

The Newport Waterways canal system is narrow in places. The dredging contractor will ensure that the impact of other vessels' use of the waterway is minimal. 

Location

Newport Canal, Griffith Road, Newport 4020  View map

Google Map