Woorim Beach sand back-passing trial - quarterly update
Published 13 August 2024
Period covered by this update: 1 May 2024 to 31 July 2024.
- 19 active pumping days.
- Minimum and maximum pumping rates were 271 and 852.5 cubic metres per day, respectively.
- Total volume pumped during this period: 10,565 cubic metres.
- Total volume pumped since 2019: 134,625 cubic metres.
The graph shows the daily and cumulative pumping volume of sand from 1 May 2024 to 31 July 2024:
Back to Woorim Beach Sand Back-Passing Trial